GENERATOR, 7-8kVA 230V 50Hz, diesel, silent

NST PELEGENE0S725

Valid Article

Former Code(s): PELEGEND07S
Hazardous materials and products (identified by their 4-digit transport UN-number) must be transported under certain conditions as specified in the MSDS sheet (Material Safety Data Sheet).
OC subscriptions: included in supply or field order tools (e.g. UniField)
SC subscriptions: included in supply or field tools
OC validations: approved for procurement and use by an OC for international or local orders specifying context and activity in Medical Standard Lists (MSL)

This combination does not exist.

See Related

Add article to list

   

Add Kit To Wishlist

   

GENERATOR, DIESEL, 230 V, 50 Hz, 7-8 kVA

Definition

Long-lasting silenced diesel generator, INTENDED FOR MID- AND LONG-TERM PROJECTS

Specifications

  • Diesel engine
  • Water-cooled
  • 1500 rounds per minute
  • Asynchronous brushless alternator
  • Single-phase, 230 V AC, 50 Hz
  • Nominal output power: 7.5 kVA, 6000 W
  • Mounted on a frame
  • Low oil and high water temperature cut-out
  • Power overload protection
  • Manual ON/OFF switch
  • Voltage fluctuation: ± 3%
  • Operating time: minimum 22 hours
  • Hour counter fitted
  • Two protected outlets for maximum 16 and 32 A (CEE)
  • Noise level: LWA 85 dB(A)
  • Lifespan: minimum 8000 running hours

Transport Dangerous Goods

Generators might be considered as dangerous goods for transport:

  • If a shipper or supplier provides written or electronic documentation stating that a flushing and purging procedure for flammable liquid powered engines has been followed in compliance with Special Provision A70 the generator is not subject to IATA DGR regulations
  • If not complying with Special Provision A70 then the generator must be managed in compliance to IATA DGR regulations

Supplied with the Article

Only supplied in the kit specified below.

Instructions for use

Intended to replace an emergency generator. Refer to your technical department for power calculations.

Do not fill the fuel tank when the engine is running.

For maximum safety and earthing, refer to the MSF guidelines on energy.

Maintenance: every 250 hours.

Some restricted information has been hidden. Sign in to see this information